Fri3ndMe Fri3ndMe
    #appdevelopment #mobileappdevelopment #techsolutions #androidapps #socketconnector
    Masusing Paghahanap
  • Mag log in
  • Magrehistro

  • Day mode
  • © 2026 Fri3ndMe
    Tungkol sa • Direktoryo • Makipag-ugnayan sa amin • Mga developer • Patakaran sa Privacy • Mga Tuntunin ng Paggamit • FAQ • Fri3ndMe Tips

    Pumili Wika

  • Arabic
  • Bengali
  • Chinese
  • Croatian
  • Danish
  • Dutch
  • English
  • Filipino
  • French
  • German
  • Hebrew
  • Hindi
  • Indonesian
  • Italian
  • Japanese
  • Korean
  • Mexicospanish
  • Persian
  • Portuguese
  • Russian
  • Spanish
  • Swedish
  • Turkish
  • Urdu
  • Vietnamese

Panoorin

Panoorin Mga pelikula

Mga kaganapan

Mag-browse ng Mga Kaganapan Aking mga kaganapan

Blog

Mag-browse ng mga artikulo

Merkado

Pinakabagong produkto

Mga pahina

Aking Mga Pahina Mga Ni-like na Page

Higit pa

Forum Galugarin Mga Sikat na Post Mga laro Mga trabaho Mga alok Mga pondo
Panoorin Mga kaganapan Merkado Blog Aking Mga Pahina Ipakita lahat
bloggerinfo
User Image
Hilahin para mailagay sa tamang posisyon ang cover
bloggerinfo

bloggerinfo

@bloggerinfo
  • Timeline
  • Mga grupo
  • Mga gusto
  • Mga kaibigan 2
  • Mga larawan
  • Mga video
  • Mga reel
  • Mga produkto
2 Mga kaibigan
1 mga post
Lalaki
bloggerinfo
bloggerinfo
3 taon ·Youtube

What are the best features of Agra Etawah Toll Road Project

To build, operate, and maintain the Agra Etawah Bypass NH 2 Project, the NHAI and AETPL (AE Tollway Private Limited), an SPV of IRB Infrastructure Developers Ltd., entered into a Concession Agreement on September 1, 2015. Long after the designated date, the Project's concession term is still in effect. During this time, the concessionaire is allowed to collect the suggested client expense from the traveling public.

AETPL has been given permission to extend six lanes on a BOT or DBFOT basis to a 124.52 km section of Uttar Pradesh's NH 2.

The section of NH 2 between kilometers 199.66 and 323.525 is part of the Agra Etawah Toll Road Project.

A list of the project's features is provided below:

six-lane highway with a length of 124.52 kilometers
Of the 750 Lane kilometer Administration road, 84.725 km
Slip road measuring 30.282 km, with three substantial additions
30 little additions
Seven in the sky
Seven rail tracks must travel through 3.08 km of obstructions due to turbulence.
The 44.68 km of the route is illuminated by the lamps.
lessons in 214
12 vehicular underpasses, 10 for light traffic, 6 for pedestrians, and a convergence of 164 underpasses
22 direct lines of traffic are halted by four trucks.
Two toll-cost courts would be appropriate. FASTag
The project will cost Rs. 3,244 Cr.
The length of the concession is 24 years.

Passageway Portrayal:

The congested National Highway 2, also referred to as the Delhi-Kolkata Road, passes through the states of Delhi, Haryana, Uttar Pradesh, Bihar, Jharkhand, and West Bengal.

The Agra Etawah Toll Road Project is necessary for the NHAI's most difficult and well-known Golden Quadrilateral project. The road project passes via the Uttar Pradesh cities of Agra, Firozabad, Mainpuri, and Etawah. The course includes coverage of significant urban regions like Agra, Etmadpur, Firozabad, Shikohabad, Jaswantnagar, and Etawah.

The Taj Mahal, Fatehpur Sikri, and Red Post are three internationally renowned attractions that have made Agra a well-known location on the travel industry's map. The fourth well-known tourist destination is the bird sanctuary in Bharatpur National Park. Itmad-ud Daula's last resting place as well as Akbar's Tomb in Sikandra have both been suggested as potential World Heritage Sites.

Gusto
Magkomento
Ibahagi
Mag-load ng higit pang mga post

Unfriend

Sigurado ka bang gusto mong i-unfriend?

Iulat ang User na ito

I-edit ang Alok

Magdagdag ng tier








Pumili ng larawan
Tanggalin ang iyong tier
Sigurado ka bang gusto mong tanggalin ang tier na ito?

Mga pagsusuri

Upang maibenta ang iyong nilalaman at mga post, magsimula sa pamamagitan ng paglikha ng ilang mga pakete. Monetization

Magbayad sa pamamagitan ng Wallet

Alerto sa Pagbabayad

Bibili ka na ng mga item, gusto mo bang magpatuloy?

Humiling ng Refund